During the 2021 Intelligent Pigging (IP)
inspection, two severe metal-loss
anomalies were detected on the 20" export
crude riser at BK-C Platform
These defects posed significant risks of
leakage, environmental exposure and
unplanned shutdown. The riser required
urgent structural restoration before the
2022 Oilfield Outbreak shutdown.
Based on the ILl results and the riser's observable condition, Hibiscus Oil and Gas
Malaysia Limited (HOGML) initiated a dedicated riser repair campaign for the
August 2022 shutdown window.