Background

During the 2021 Intelligent Pigging (IP) inspection, two severe metal-loss anomalies were detected on the 20" export crude riser at BK-C Platform

These defects posed significant risks of leakage, environmental exposure and unplanned shutdown. The riser required urgent structural restoration before the 2022 Oilfield Outbreak shutdown.

Based on the ILl results and the riser's observable condition, Hibiscus Oil and Gas Malaysia Limited (HOGML) initiated a dedicated riser repair campaign for the August 2022 shutdown window.

Our Role

ECMS proposed a complete Sectional Riser Replacement, delivering:
• Defect verification and HPWJ cleaning
• Cutting and removal of the damaged riser section
• Fabrication and installation of a new riser spool
• Offshore welding, alignment and fit-up
• Full NDT, pressure testing and documentation
• DOSH verification and repair approval

Outcome

✓ Riser integrity fully restored
✓ Work delivered within shutdown schedule
✓ Zero-incident execution
✓ Full regulatory compliance and safe reinstatement